Day 2 of the 2016 Season
Very good progress was made on our second day in part due to the cooler weather. In DR40, we are almost to the level of the lower potion of the window wall:
Very good progress was made on our second day in part due to the cooler weather. In DR40, we are almost to the level of the lower potion of the window wall:
DR40 on 04 July 2016
by Dr. Mark Schuler
on Sketchfab
In DP44 we are approaching floor level and so we opened a portion of DP45 to the north.
DP44 and DP45 on 04 July 2016
by Dr. Mark Schuler
on Sketchfab
Most fascinating is that W583 does not continue to the north but end with a substantive pilaster after 1.2 m. We will search for a match to the north.